Client: San Antonio Water Systems (SAWS)
Location: San Antonio, TX

Aurora served as a sub-consultant to the lead engineer, Pape-Dawson, on the 2020 CMOM Package 3 project that consisted of the installation of approximately 3,000 LF of 21-inch gravity sewer main by open and trenchless methods. Aurora was selected to provide technical support on the design and constructability review of the trenchless segments, including the development of casing and liner plate loading calculations and recommendations for allowable construction methodologies based on soil and site conditions.